Key Takeaways
- Start by confirming which building department controls your lot, then get the debris sign-off before anyone draws plans.
- A licensed engineer, not a hopeful guess, decides whether your old foundation, slab, or retaining walls can stay.
- Plan early for current fire, energy, and utility requirements, and keep your insurance and living-expense records organized for a long process.
The first step in any guide to post fire rebuilding is to find out which building department controls your lot. Then confirm the site is cleared, tested, and safe to build on before anyone draws plans. After that, an engineer checks what you can reuse, and your design team prepares plans that meet today’s code. The building department reviews those plans, inspects the work, and issues the final sign-off that lets you move back in. This article covers the decisions that slow most fire rebuilds down, so you can plan around them instead of discovering them halfway through.
What's the first step in a guide to post fire rebuilding?
Find out which agency issues your permits, because every other decision depends on it. Lots inside the City of Los Angeles go through LADBS, unincorporated county lots go through Los Angeles County departments, and other cities each have their own building department.
Your mailing address can fool you. Plenty of homes have a “Los Angeles” mailing address but sit in unincorporated county territory, which follows county rules and county reviewers. Look up your parcel on the City’s ZIMAS map first. If your lot is inside the City, the LADBS wildfire rebuilding page lists plan submittal requirements, a parcel lookup, and a way to request your old permit records.
If your lot is in unincorporated county territory, start with the county’s Road to Rebuilding guide. Public Works, Regional Planning, Public Health, and County Fire all contributed to it. If you’re in a separate city, call that city’s building department directly. Its rules on size limits, setbacks, and review paths may differ from both the City and the County.
One more layer catches people off guard. If you have a homeowners association, it may want its own plan review before you submit to the building department. Ask for the HOA’s requirements now, while your designer is still sketching, not after plans are done.
What has to happen before I can apply for a rebuild permit?
Debris has to be removed under a debris removal permit, and the agency needs confirmation that it was hauled away and disposed of properly. Depending on your lot, Public Health, Planning, or the fire department may also need to sign off before building permits are issued.
A burned lot isn’t just ash. Older homes often contained asbestos in siding, flooring, and duct wrap. They also had lead paint and treated wood. Those materials have to be handled by crews trained for hazardous waste. Soil testing may be required to show the ground is clean enough to build on.
A typical order of work before plans are submitted looks like this:
- Debris removal by an approved program or a licensed private hauler, under the required permit.
- Confirmation that the debris was removed and disposed of properly, plus any required soil testing.
- A survey of the cleared lot, so your designer knows exact property lines and grades.
- A check of what’s left: foundation, retaining walls, utility stubs, and trees.
- Any added approvals your agency requires before building permits can be issued.
Don’t let anyone break out the old slab or retaining walls during cleanup until an engineer has looked at them. Once concrete is gone, you can’t get it back. Removing it can also change what you’re allowed to rebuild and how much the foundation work costs.
Can I rebuild exactly what I had, or can I build bigger?
Most agencies offer a "like-for-like" path, which means rebuilding roughly what existed, with lighter zoning review. Building bigger than the allowed increase usually sends your project through full zoning review, with current setbacks and other rules.
Like-for-like rules aren’t the same everywhere. The City’s emergency order allowed a modest increase in the old building’s height and footprint and let some older setbacks stay. The County set its own limits for each burn area. These programs were created by emergency orders and can change, so read the current version on your agency’s page before your designer commits to a size.
To use like-for-like, you have to prove what existed. Old permits, the Certificate of Occupancy (the document that says what the building was approved to be), insurance photos, and prior plans all help. In the City, you can request plans and records through LADBS. Start that request early, because old records can be incomplete.
The City also created faster review options, including pre-approved standard plans and a self-certification pilot. Self-certification lets a licensed architect certify that plans meet code. Both were set up as temporary programs, so confirm with LADBS that they’re still running. The City’s rebuilding FAQ also states that lots in geologically sensitive areas don’t qualify for self-certification. Hillside owners should plan for regular plan check, which is the standard review where city staff check your drawings against code.
Can I reuse my old foundation, slab, or retaining walls?
Sometimes, but only a licensed engineer can make that call after testing. Heat can weaken concrete and the steel inside it even when the surface looks fine, and an old foundation may not meet current anchorage requirements.
Concrete exposed to long, hot fires can spall, meaning the surface pops off in flakes or chunks. It can also crack in fine patterns or lose strength inside. The rebar, the steel bars cast into concrete, can lose strength too. In older Los Angeles homes, the foundation may predate modern anchor bolts and hold-downs, so even an undamaged footing might need upgrades to carry a new house.
A reasonable evaluation usually goes like this:
- Visual review of cracking, spalling, color change, and exposed steel.
- Testing as the engineer directs, which may include taking concrete samples.
- A check of size, depth, and anchorage against what the new house needs.
- A written recommendation: reuse as is, repair, strengthen, or replace.
That written recommendation matters for your insurance claim and your plans. We cover the details in our article on whether you can reuse a foundation after a fire. If part of the house is still standing, read about what a fire damaged home inspection should cover before you decide what stays.

Do I need a survey, soils report, or grading permit on a burned hillside lot?
On most hillside lots, yes. Expect a survey, and often a soils or geology report and grading review, because burned slopes behave differently and agencies look closely at drainage and stability.
Fire burns off the plants whose roots held the slope together. The first heavy rains after a fire can wash mud and rock downhill. That’s a debris flow, a fast-moving slurry of soil, ash, and rock. A geotechnical report, written by a soils engineer or engineering geologist, describes what the ground can support. It also recommends foundation and drainage designs.
Warning signs on a burned slope include new cracks at the top of the hill, bulging soil near the toe, water seeping out of the slope, and leaning or cracked retaining walls. Don’t stack debris or park equipment near the top of a slope you’re unsure about. Protect it during the rainy months with erosion controls your engineer or agency approves.
The City may also require stormwater LID clearance. LID stands for low impact development: a plan that keeps rainwater on your lot or slows it down instead of dumping it into the street. The City’s rebuilding page explains when it applies and how it can be handled. If your project moves dirt or rebuilds retaining walls, plan on grading review even if the house itself qualifies for a faster path. Any honest guide to post fire rebuilding puts the hillside work first, because the house can’t be designed until the ground is understood.

What will today's code require that my old house didn't have?
Your rebuild has to meet current code, which usually means stronger wildfire-resistant construction in fire hazard zones, current energy rules, and updated structural details. Expect these items to be part of plan check, not optional extras.
Fire hazard severity zone maps have been updated, so check your address rather than assuming. In mapped zones, wildfire rules cover the roof, vents, siding, windows, decks, and the area right around the house. Expect a Class A roof (the highest fire rating for roofing), ember-resistant vents, and tempered multi-pane windows. Expect fire-resistant materials near the ground too. For a closer look, see our article on fire-resistant exterior materials for LA homes.
The energy code also affects new homes. Depending on the project, it can require solar and electric-ready wiring, along with insulation and window performance. Energy compliance paperwork goes in with your plans. If it’s missing or doesn’t match the drawings, plan check stops until it’s fixed.
Structural details have changed too. A house built decades ago may have had few hold-downs and light anchorage. A rebuild is the cheapest moment to get earthquake strength right, because the walls are open and the foundation is being designed anyway. Ask your engineer to design for current anchorage. That also helps when you shop for earthquake insurance later.
How do I get electric, gas, water, and sewer service back?
Each utility has its own application, and those requests take time, so start them early in design. Your electric provider, gas company, water purveyor, and sewer or septic authority all have to approve new or restored service.
Electric service comes from LADWP or Southern California Edison, depending on where you live. A new house with solar, electric appliances, and car charging may need a bigger service than the old one had. That can mean a new panel location, a new meter, or utility work at the street. SoCalGas handles gas restoration and new meters if you keep gas.
Underground lines can be damaged even when nothing shows at the surface. Heat and heavy equipment can crack an old clay sewer lateral, the private pipe from your house to the city sewer. Have a camera inspection done before you build over it. Water meters and backflow devices may also need replacement. On lots with septic systems, the health department reviews whether the system can be reused.
Here’s a practical sequence:
- Confirm which utilities serve your parcel and what’s left of each connection.
- Have the sewer lateral inspected by camera and the septic system checked if you have one.
- Give your designer load calculations so the electric service is sized correctly.
- Submit utility applications while plans are in review, not after.
- Call DigAlert before any digging near existing lines.
How do I keep insurance covering code upgrades and living expenses?
Read your policy for building code upgrade coverage and Additional Living Expense limits, and track every expense. Coverage depends on your specific policy and limits, so don't assume the full rebuild or every code upgrade is covered.
Additional Living Expense, or ALE, pays the extra cost of living somewhere else while you rebuild. The California Department of Insurance has stated that after a declared state of emergency, most residential policies are required by law to provide at least 24 months of ALE coverage, with extensions possible when delays are beyond your control. Your own policy terms and dollar limits still control what you receive.
Code upgrade coverage is separate and often limited. Get your contractor’s scope to the adjuster early, with the code-required items clearly marked: foundation strengthening, fire-resistant materials, energy items, and utility upgrades. Insurers can miss those items when the first estimate is written from photos.
You have the right to choose your own contractor. Before you sign anything or pay a deposit, look up the license on the Contractors State License Board website and confirm it’s active and matches the name on the contract. After big fires, unlicensed crews show up fast, so walk away from large cash deposits, same-day pressure, or anyone promising permit timing. If you hire a public adjuster, confirm that person is licensed with the Department of Insurance.
If insurance won’t cover everything, look into SBA disaster loans and FEMA programs. Their rules change, so check current terms directly with those agencies before you count on them in your budget.
What inspections happen before I can move back in?
The building department inspects the work in stages, from foundation through framing, rough trades, insulation, and final. When everything passes, it issues the final approval or Certificate of Occupancy that lets you live in the house again.
Inspections follow construction. The building department sets the schedule and decides whether each stage passes, so build some room into your plans for re-inspections. The usual order is:
- Foundation and footing forms with rebar in place, before concrete is poured.
- Underfloor or under-slab plumbing and utilities.
- Framing, shear walls, and hold-downs, with the roof on.
- Rough electrical, plumbing, and mechanical work.
- Insulation and energy items, before the walls are closed.
- Final inspection, including fire-resistant details, smoke and carbon monoxide alarms, stormwater items, and any other agency sign-offs.
Final approval often depends on more than the building inspector. Fire department items, stormwater clearance deferred to the end, utility releases, and public works sign-offs for driveway or sidewalk work can all be required. Keep a running checklist of every agency involved. Following a guide to post fire rebuilding like this one helps you spot those sign-offs early, so the last inspection isn’t the first time anyone notices a missing approval.
When should you call a licensed contractor for your fire rebuild?
Call a licensed contractor once the debris is cleared, or sooner if part of the house is still standing. Bring one in before anyone breaks out the slab, retaining walls, or utility connections. A contractor who handles fire rebuilds can coordinate with your engineer, help you read the insurance scope against real field conditions, and keep plan check corrections and inspections moving with the building department. Our article on how to choose a fire damage restoration contractor lists good questions for the first meeting. Villa Bella Construction is licensed and insured. Our approach is to find what’s truly damaged and save what an engineer confirms is sound. You can learn more about our fire damage rebuilding work.
“If you want an honest, licensed contractor in the LA area, I highly recommend them!” — Robert H., Google review
Villa Bella Construction is a licensed and insured general contractor, building in Los Angeles for 25 years. CSLB License #1093648 (B – General Building).
Call +1 (323) 825-9798 or send us your project details.
Learn more: Fire damage rebuilding.
Planning a construction or remodeling project in Los Angeles?
Schedule a Free On-Site Consultation or call +1 (323) 825-9798.