Beam Post Footing in a Kitchen: Do New Posts Need One?

A gutted kitchen in a 1960s single-story slab-on-grade house, shot from a low angle across the room, showing a new wood beam spanning a wide

Key Takeaways

  • A beam post needs a new footing when nothing strong enough sits under it, which is common for posts that land mid-room.
  • Subfloors and typical house slabs aren't built for a concentrated post load, so a licensed engineer decides what goes under each post.
  • The footing must appear on the approved foundation plan, and the hole is inspected before any concrete is poured.

Often, yes. Not every post needs a new footing, but most posts for a new kitchen beam can’t just sit on a floor or slab that was never built for that much weight. When you take out a load-bearing wall, the beam gathers the load the wall spread along its whole length and drops it onto two small spots. That’s why the beam post footing, kitchen floor framing, and soil under each post matter as much as the beam itself. A licensed engineer decides whether the existing foundation can carry that load or whether new concrete goes in, and the city building department reviews that design before work starts.

Does every new beam post need its own new footing?

No. A post that lands on an existing foundation wall, or on a girder and pier line the engineer can show is strong enough, may not need anything new. A post that lands in the middle of a room, away from any foundation, usually does, and that call belongs to the engineer.

A footing is the concrete pad or strip in the ground that spreads a building’s weight over enough soil to hold it. Your house already has footings under the outside walls and often under some interior walls. The real question is whether one sits exactly where each new post will land.

Beam ends usually fall where the old wall ended. Sometimes that’s against an exterior wall with a continuous foundation under it, which is a good start. Other times the wall stopped at a hallway or an open floor area with nothing under it but joists or a thin slab.

Even when a footing exists, it has to be big enough and deep enough for the new load. An old interior footing built for a light wall may not qualify. The engineer runs the numbers and may keep it, enlarge it, or call for a new beam post footing right beside it.

If you’re still deciding whether the beam hides in the ceiling or hangs below it, our article on flush beam versus dropped header options covers that choice. The post question stays the same either way.

Why can't the post just sit on the subfloor or the existing slab?

A post delivers a heavy point load to one small spot, and subfloors and typical house slabs are built for loads spread over a wide area. Set a loaded post on either one and the floor can sag, crack, or slowly punch through.

A point load is weight concentrated on a small area instead of spread along a wall. The wall you removed carried its share of the roof, the ceiling, and sometimes an upper floor along its full length. The beam collects all of that and sends it down through two posts only a few inches wide.

A plywood subfloor, the sheathing you walk on, spans between joists and is meant for people, furniture, and cabinets. A slab-on-grade floor, which is concrete poured directly on the ground, is usually only a few inches thick in a house and often has little reinforcement in the middle of a room. Neither was designed to hold a post carrying that kind of weight.

The warning signs show up later: a dip in the floor around the post base, cracks radiating out from it, doors upstairs that start to stick, or drywall cracks near the beam ends. In older Los Angeles homes, these signs often appear where a past owner opened a wall without permits and set the post on whatever was there. If your floor already dips near the sink or the old wall line, our article on a sagging kitchen floor near the sink explains other causes to rule out.

How does a raised floor or a slab change the beam post footing in a kitchen?

On a raised foundation, the post load usually travels through solid blocking or a girder down to a pier and pad in the crawlspace, often without breaking concrete. On a slab, the floor has to be saw-cut, dug out, and a new pad poured, right where kitchen plumbing often runs.

Not sure which you have? A raised foundation has a crawlspace, a short open space under the floor. Look for screened vents along the base of the outside walls and an access hatch in a closet or outside. A slight bounce and a hollow sound underfoot point to a raised floor. A hard floor with the house sitting close to the ground and no vents usually means a slab.

On a raised floor, the engineer traces the load from the post through the framing to the soil. That may call for solid blocking, which is short lumber packed between joists so the post doesn’t crush them, plus a girder, a heavy beam that supports floor joists, and a new concrete pier pad on the ground below. The crew works from the crawlspace, so the kitchen floor often stays mostly intact.

On a slab, there’s no space underneath to work from. The crew marks the footing outline, saw-cuts the slab, breaks out the concrete, and digs to the depth on the plans. After the new pad is poured, the slab is patched around it. It’s messier, and it’s where surprises under the floor show up.

A flashlight-lit view inside a dirt crawlspace under a raised-floor house, showing a new concrete pier pad with a short wood post and steel connector

How do you find out what's under each post before the plans are final?

You check in the field instead of guessing. Someone looks in the crawlspace or opens a small test area in the slab, and the findings are compared with the property's permit and plan records.

Older Los Angeles houses have been added to and remodeled many times, and the original drawings, when they exist at all, rarely match what’s there now. A footing everyone assumed was under a wall can turn out to be missing, small, or cracked.

A typical check goes like this:

  1. Pull the permit history from the city building department to see past additions and wall changes.
  2. On a raised floor, crawl to each proposed post spot and photograph the framing, any piers, and the soil.
  3. On a slab, open a small test hole near each post location to see slab thickness and what sits below.
  4. Locate drain, water, gas, and duct lines that run near the post spots.
  5. Give everything to the engineer, who can mark a field verification on the plans for anything that can’t be confirmed until demolition.

That last step matters. When the plans say a condition must be verified once the floor is open, the crew stops and checks before building. Nobody pours concrete on an assumption.

Who decides the footing size: the engineer, the city, or the contractor?

The engineer designs it, the city reviews the design, and the contractor builds exactly what the approved plans show. Nobody should pick a size on the job site by rule of thumb.

Footing size comes from calculations: how much load the post carries and how much the soil can safely hold. You’ll find forum posts claiming one standard size is always good enough. Ignore them. Two kitchens that look alike can carry very different loads depending on the roof, a second story, and the ground under the house.

The soil side can call for a soils report, a study by a geotechnical engineer describing how the ground under your house behaves. It’s more likely on hillside lots, on expansive clay that swells when wet, or on fill dirt. In the City of Los Angeles, the LADBS plan check correction sheet says soil, foundation, and geology reports must be approved by the department’s Grading Section. That adds a review step, so plan for it early.

Once the design is set, the contractor’s job is to build it as drawn and speak up when the field doesn’t match. A good builder doesn’t quietly shrink a footing because the hole hit a root or an old pipe.

What does the city require before the concrete goes in?

A structural change like this needs a building permit with approved plans, and the footing excavation must be inspected before the pour. The city building department decides how long review takes and whether each inspection is approved.

The LADBS building permits page says structural alterations go through plan check, the city’s review of your drawings before a permit is issued. Other cities around Los Angeles have their own building departments and processes, so check with the one that covers your address. For the broader paperwork picture, see what permits a kitchen remodel needs in LA.

The LADBS homeowner’s guide to permits and inspections describes a plan set with a framing plan and a foundation plan, and it says to call for inspection before covering any work. The new pads, their depth, and their steel belong on that foundation plan.

The usual order of work:

  1. Install temporary shoring, short temporary walls or adjustable posts that hold up the ceiling while the old wall comes out.
  2. Remove the wall and open the floor at each post location.
  3. Dig to the size and depth on the approved plans and set the reinforcing steel.
  4. Call for the foundation inspection and wait for it before pouring.
  5. Pour, then let the concrete cure for the time the engineer specifies before loading the post.
  6. Set the posts and beam, then call for framing inspection before closing anything up.

The same guide says changes from the approved plans need reapproval. If a footing has to move, that goes back through the engineer and the city first.

A rectangular saw-cut opening in a gray kitchen slab, with a squared footing hole dug below it and tied rebar resting on small concrete blocks,

What if the new footing lands on a drain, water line, or gas line?

Then the footing or the line has to move, and the engineer and plumber sort it out before the slab is cut. Kitchens are where this happens most, because drains, water, and gas usually run under the floor nearby.

On slab houses, the kitchen drain often runs under the floor to the main sewer line. Gas may run under the slab or through the crawlspace to the range. Some older homes also have floor ducts for heat. Any of these can sit right where a post needs a pad.

Before anyone digs a beam post footing, kitchen lines have to be located. A camera run through the drain, a trace of the gas route, and hand digging near suspected pipes are standard. Breaking an old cast-iron drain or nicking a gas line mid-excavation is dangerous and turns a clean job into a mess.

The fix might be shifting the post with a revised engineer’s detail, rerouting a short piece of pipe, or designing a footing shape that clears the line. If your remodel also moves the sink, our article on moving a kitchen sink to an island on a slab explains how new under-slab drains are planned. It’s smart to coordinate that trench and the footing holes together.

Does taking out the wall affect earthquake bracing and the footings?

It can. Some interior walls also brace the house sideways in an earthquake, and removing one may mean new bracing elsewhere, with hold-downs anchored into new or existing concrete.

A shear wall is a wall sheathed and nailed to resist sideways forces from wind or earthquakes. Plenty of interior walls carry only vertical load, but the engineer has to check, especially when the kitchen wall is one of the few solid walls in the middle of the house.

If bracing is needed, the plans may show a new braced panel or a steel frame, plus hold-downs, which are steel brackets that tie the end of a wall to the foundation so it resists lifting during shaking. Hold-downs need concrete under them with anchors in the right spot. That can mean another new footing beyond the two under the beam posts.

The LADBS correction sheet asks designers to show hold-down locations on the foundation plan, and that hardware has to be secured before the foundation inspection. In Los Angeles, the ground moves often enough that this detail deserves real attention.

Does an older house need lead or asbestos checks before the wall and slab come out?

Often it does. Homes built before 1978 may have lead paint, and older flooring, joint compound, and other materials may contain asbestos, both of which come with rules for demolition and cutting.

Under the EPA Renovation, Repair and Painting Program, hired contractors who disturb paint in homes built before 1978 must be lead-safe certified and follow containment and cleanup practices. The rule generally doesn’t cover owners working on their own homes, but it does apply if you rent all or part of the home.

Asbestos is a separate concern. Old vinyl tile, its black adhesive, joint compound, and some textured ceilings can contain it. The South Coast AQMD asbestos guidance for owners describes a narrow exemption only for an owner-occupant personally doing the work in a single-unit home, and it still advises against homeowner removal. Testing before demolition is the safe path.

If tenants live in the building, plan how they’ll keep water and a working kitchen, and follow the rental rules on notice. Slab-cutting dust travels, so containment protects everyone in the house.

When should you call a licensed contractor about beam posts and footings?

Call before you remove any wall you suspect is load-bearing, not after it’s half gone. Call sooner if you already see a dip in the floor at an old opening, a post sitting directly on a slab, or cracks spreading from a beam end. Those usually mean a past change skipped the footing work.

A licensed and insured contractor working with a licensed engineer can check what’s really under each post, plan around the plumbing, and build what the city reviews. Villa Bella Construction looks for the real cause first, then recommends the safest targeted repair the city will accept, without tearing out more than the problem needs. Learn more about our kitchen remodels with structural or plumbing problems, and verify any contractor’s license with the state board before you sign.

“Steve was easy to work with and was very responsive.” — Bill M., Yelp review

Villa Bella Construction is a licensed and insured general contractor, building in Los Angeles for 25 years. CSLB License #1093648 (B – General Building).

Call +1 (323) 825-9798 or send us your project details.

Learn more: Kitchen remodels with structural or plumbing problems.

Written by Villa Bella Construction. Licensed and insured general contractor in Los Angeles. CSLB License #1093648 (B – General Building).